The big towers were 123 and 132 minutes.
A medium tower was 105 and a small one 42.
Roughly 654 just short of 11 hours to do the lines! I also did the first highlight on all the spikes and the bonewhite Wraithbone chips on the base.
Then when I came to do the spots I decided not to bother keeping track and now I'm really annoyed with myself because that took far more time than I expected. It definitely would have been handy to know for the 2nd set of highlights.
2nd highlights feel quicker as you can see where you going to put a spot or line. But, it actually requires you to be much neater and controlled. That way you don't completely cover the first stage work. Or else what's the point?
I've had 2nd stage sessions that have been much faster, the same or even taken longer, but a rough estimate is always handy. Second stage next and then maybe some very minor 3rd stage highlights, the red fleshy bits and 2nd stage bone. Lots to do on the Chitin, but then it feels like it's downhill from there.







No comments:
Post a Comment